Surface Preparation
- All internal surfaces of the pipes were prepared by abrasive blasting to ISO 8501/4 SA2.5(SSPC SP10 / NACE 2) with a minimum angular blast profile of 75 microns. This preparation ensured a clean and appropriately roughened surface for optimal adhesion of the repair materials.
- The blast surfaces were then cleaned and degreased using UPS 9918 MEK Cleaner to remove any contaminants before the repair process.
Application of UPS 200 EG CERAMIC REPAIR PASTE
- UPS 200 EG was applied to rebuild eroded areas and repair pitting. This step restored the structural integrity of the pipes, filling in the areas that had suffered the most damage.
Application of UPS 205 FG FLUID GRADE CERAMIC
- The entire internal surface of the pipes was coated with two layers of UPS 205 FG. The first coat, applied at 400 microns, was in grey, followed by a second coat in blue at 400 microns. This dual coating not only provided a robust protective layer but also made it easier to visually inspect the application for complete coverage.