Surface Preparation
- The steel pilings were prepared using hand-held needle guns to remove loose corrosion, marine growth, and create a coarse profile for the coating to bond to.
- To prevent contamination of the river, debris mesh was laid out over the pontoons during the preparation process.
- After surface preparation, the repaired areas were thoroughly cleaned with fresh water to remove any remaining debris.
Application of UPS 250 UWC UNDERWATER CERAMIC
- The application was carried out from floating pontoons. The sections of the steel pilings that were permanently exposed to air and the splash zone were coated with UPS 250 UWC.
- The UPS 250 UWC was applied using a plastic applicator to achieve a nominal thickness of 1mm. The coating was designed to cure even when submerged, ensuring long-lasting protection against both corrosion and erosion.